Customized Pipe Fittings

Discussion in 'General Discussion' started by wte358, Apr 20, 2019.

  1. wte358

    wte358 Member

    Joined:
    Apr 20, 2019
    Messages:
    10
    Likes Received:
    0
    Quick Details
    Material: Stainless Steel
    Technics: Forged
    Type: Elbow
    Place of Origin: Jiangsu, China (Mainland)
    Model Number: stainless steel pipe fitting
    Brand Name: Roke or OEM
    Connection: double ferrule
    Shape: elbow
    Head Code: Hexagon
    Name: stainless steel pipe fitting
    Packaging & Delivery
    Packaging Details:stainless steel pipe fitting
    1.plastic film+carton box
    2.quantity:10 pcs/carton
    3.carton size: 21cmx16cmx11cm
    Delivery Detail:Shipped in 25 days after payment

    1.Namestainless steel pipe fitting
    2.MaterialStainless steel/carbon steel/hastelloy C-276/super duplex 2507
    3.Pressure350bar
    4.Connectionthreaded
    5.Size1/2"-2"

    1.Material :SS304, SS316,SS304L,SS316L,SS410,SS416.etc.
    2.Size: 1/4'' Adjustable 90 Degree Elbow Union Pipe and Fitting Stainless Steel
    3.Pressure Rating: 6000PSI
    4.Logo: Roke ,required logo is available
    5.MOQ:48pcs
    6.Samples Time:(1)3-5days-If you want to customize your product and logo.
    (2)1day-For our existing samples for reference.
    7.OEM AcceptedYes
    8.Certification available:Yes
    9.Packing Details: 1. wooden box, 38*27*17CM; 2. carton: 21*16*14CM/31*21*16CM. 3. as your request.
    10.Production Capacity:30,000pcs Per month.
    11.Payment Term:(1) L/C,T/T,D/P,D/A,PAYPAL,WESTERN UNION,MONEY GRAM
    (2) We also can provide a monthly statement payment services.
    FAQ
    Q1. Can I have a sample order for valve?
    A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

    Q2. How long is your delivery time?
    A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
    Q3. Do you have any MOQ limit for valve order?
    A: Low MOQ, 1pc for sample checking is available
    Q4. How do you ship the goods and how long does it take to arrive?
    A: We usually ship by sea. It usually takes 30 days to arrive. Airline shipping also optional.
    Q5. How to proceed an order for your products?
    A: 1st, give us your requirements, drawings or application. 2nd, we will quote according to your requirements or our suggestions. 3rd, you should confirm the samples and places deposit for formal order. 4th, we arrange the production.
    Q6: Do you offer guarantee for the products?
    A: Yes, we offer 12 months warranty to our products. Welcome to purchase low price stainless steel nipple made in China or try the customized service with Naco Fluid Equipment, which has been focused on this field since 2008. We are equipped with a professional and productive factory which can offer you cheap price. Now, take action to get free sample of stainless steel nipple with us.Customized Pipe Fittings
    website:http://www.nacoroke.com/pipe-tube-fittings/pipe-fittings/